Pre-Engineering

Facilities

The Kidd Math/Science Center opened in 1985. With an award-winning masonry design, the center’s front doors open to a glass atrium with live plants & a trickling pond. A spacious lobby follows with comfortable studying facilities. The center houses three large chemistry labs, three biology labs, one physics lab, one computer lab, lecture rooms, faculty offices and a large bent glass greenhouse that enhances the view of campus. McKenzie Hall opened in 1997, and it provides math/science students, along with the nursing students, two large lecture halls, a variety of lecture rooms, an anatomy lab, three computer labs, faculty offices and a conference room with a beautiful view of campus and the surrounding landscape.

Degree Requirements

Additional Academic Requirements

Graduation requires students to achieve a 2.00 overall grade point average in all coursework.

To view and/or print a copy of the Pre-Engineering fact sheet, which includes a suggested course sequence, visit the program’s website at /businessandtechnologies/pre-engineering/